Project Id

1902-0989

Bid Type

Archived

Posted

N/A

Bid Documents Available

August 18, 2020

Bid Opening

September 29, 2020

The Georgia Ports Authority will receive Statement of Qualifications for Garden City Terminal Container Berth 1 Realignment project on September 29, 2020 at 2 P.M.  The proposed project consists of construction services required to realign Container Berth 1 at the Garden City Terminal.  The berth will be realigned to create a continuous berth from Container Berth 1 to Container Berth 3.  Crane beams, wharf paving, and other supporting infrastructure will be installed to support new Ship to Shore Cranes and dock operations at the berth.

The Architect/Engineer is Moffatt & Nichol, Michael Pettijohn, P.E., 2 East Bryan Street, Suite 501, Savannah, GA 31401

[email protected]

Tel: 912.231.0044, Fax: 912.231.0046

RFQ Documents will be on file for review in the offices of the Architect/Engineer after August 18, 2020.  Complete sets of documents in a PDF format will be made available from an Internet site maintained by Moffatt & Nichol.  Electronic files (pdf) of RFQ Documents may be obtained by contacting the Architect/Engineer’s Administrative Assistant, Judy Scott, Moffatt & Nichol, at the above address, via telephone or via email [email protected].

 

 

 

Project Manager

Michael Pettijohn, P.E. Email

Address

2 East Bryan Street, Suite 501, Savannah, GA 31401

Phone

912.231.0044

Document Downloads