Project Id
1902-0989
Bid Type
Archived
Posted
N/A
Bid Documents Available
August 18, 2020
Bid Opening
September 29, 2020
The Georgia Ports Authority will receive Statement of Qualifications for Garden City Terminal Container Berth 1 Realignment project on September 29, 2020 at 2 P.M. The proposed project consists of construction services required to realign Container Berth 1 at the Garden City Terminal. The berth will be realigned to create a continuous berth from Container Berth 1 to Container Berth 3. Crane beams, wharf paving, and other supporting infrastructure will be installed to support new Ship to Shore Cranes and dock operations at the berth.
The Architect/Engineer is Moffatt & Nichol, Michael Pettijohn, P.E., 2 East Bryan Street, Suite 501, Savannah, GA 31401
Tel: 912.231.0044, Fax: 912.231.0046
RFQ Documents will be on file for review in the offices of the Architect/Engineer after August 18, 2020. Complete sets of documents in a PDF format will be made available from an Internet site maintained by Moffatt & Nichol. Electronic files (pdf) of RFQ Documents may be obtained by contacting the Architect/Engineer’s Administrative Assistant, Judy Scott, Moffatt & Nichol, at the above address, via telephone or via email [email protected].
Project Manager
Michael Pettijohn, P.E. Email
Address
2 East Bryan Street, Suite 501, Savannah, GA 31401
Phone
912.231.0044
Document Downloads