Project Id

2209-1130

Bid Type

Cancelled, On Hold

Posted

August 7, 2023

Bid Documents Available

September 29, 2023

Bid Opening

June 18, 2024

The proposed work consists of the demolition and reconstruction of warehouses and other associated works.  Associate works include construction of truck loading canopies, equipment sheds, asphalt paving (new and overlay), gravel road, refurbish existing rail system and re-establish grade (rail bed and ballast), install fire water loop and hydrants, elimination of depressed truck loading area, upgrade the drainage system, demolition of existing conveyor system, procure and install conveyor system, hard car unloaders, and rail car winch.  The project will be a Design-Build procurement.  The project is located at Bainbridge Terminal, Bainbridge, Georgia.

Project Manager

Anirban Bhadra Email

Address

22 Barnard Street, Suite 240, Savannah, GA 31401

Phone

1.404.398.4252