Project Id
2209-1130
Bid Type
Cancelled, On Hold
Posted
August 7, 2023
Bid Documents Available
September 29, 2023
Bid Opening
June 18, 2024
The proposed work consists of the demolition and reconstruction of warehouses and other associated works. Associate works include construction of truck loading canopies, equipment sheds, asphalt paving (new and overlay), gravel road, refurbish existing rail system and re-establish grade (rail bed and ballast), install fire water loop and hydrants, elimination of depressed truck loading area, upgrade the drainage system, demolition of existing conveyor system, procure and install conveyor system, hard car unloaders, and rail car winch. The project will be a Design-Build procurement. The project is located at Bainbridge Terminal, Bainbridge, Georgia.
Project Manager
Anirban Bhadra Email
Address
22 Barnard Street, Suite 240, Savannah, GA 31401
Phone
1.404.398.4252