Landscape Maintenance
Location:
Garden City Terminal
Project Id:
25-LL-7-594, 616, 617
Bid Type:
Open Bids
Division:
Engineering / Maintenance
Bid Posted Date:
October 15, 2024
Bid Documents Available:
October 15, 2024
Bid Due Date:
October 31, 2024
Contract Description: 12 Mo. Contract to provide all labor, materials, equipment, tools, and services required to provide full professional landscape maintenance, on properties owned by Georgia Ports at the Garden City Terminal, Garden City West Terminal, and Savannah Transload Facility.
Contract Term: The contract term will be a twelve (12) month period and may be renewed for two (2) successive one (1) year renewal periods with written approval of the GPA and the vendor. If funding for a renewal period is approved, the services would be ordered on a new contract if all contracting parties so agree, and services/products provided by the vendor have been satisfactory.
Mandatory Pre-Conference: [10:00 a.m., Thursday, October 24, 2024]
Location: Georgia Ports Authority
Administration Building, Downstairs Admin Conference Room
2 Main St., Garden City, GA 31408
**(Confirm your interest in participating by emailing Lisa Lansford: [email protected] by 4:00 p.m., Wednesday, October 23, 2024)
Document Downloads: