RTG Electrification Trial, GPA completed the installation of the electrical and structural infrastructure for the
electrification of four (4) Rubber Tired Gantry (RTG) cranes at the Garden City Terminal.
GPA completed the installation of the electrical and structural infrastructure
3 MIN READ