Project Id
2507-1184
Bid Type
Out for Bid
Posted
December 2, 2025
Bid Documents Available
December 2, 2025
Bid Opening
January 13, 2026
The proposed work consists of uniformly raising the elevation of the existing 26-acre concrete parking lot by approximately 3 feet. Work includes breaking and processing the existing concrete
pavement in place, placing structural fill to achieve the required elevation, constructing Fabriform slope protection along the perimeter tie-ins, installing new asphalt pavement over the raised site,
applying pavement striping, and implementing all required erosion and sediment control measures, including ongoing monitoring.
Project Manager
Rhodion Gallego Email
Address
301 West Broughton Street, Unit 3A, Savannah, GA 31401
Phone
(832) 524-7813
Document Downloads
Colonels-Island-Terminal-North-Yard-Improvements-Phase-2.pdf