East River Terminal & Lanier Dock

Moving a diverse mix of bulk commodities

Strategically located to serve Georgia’s biomass industry

At East River Terminal in Brunswick, terminal operator Logistec moved 1.2 million tons of bulk cargo in FY2019, an increase of 203,000 tons, or 20 percent. The improvement was largely associated with an increase in wood pellets, peanut pellets and perlite.

Facility overview

Overview

Terminal owner Georgia Ports Authority
Terminal operator Logistec USA, Inc.
Terminal area 66 Acres / 27 Hectares
Channel width 400 ft /121.9 m
Channel project depth 35 ft / 10.6 m at MLW
Tidal range 7.3 ft / 2.2 m
East River turning basin 1,100 ft x 4,700 ft / 335.3 m x 1,432.6 m
Cargo handled Dry bulk and liquid bulk
Vessel berths 1 2 Lanier Dock Total
Linear Feet 560 540 500 1,600
Linear Meters 171 165 152 488
Depth alongside 35 ft / 10.6 m 35 ft / 10.6 m 35 ft / 10.6 m
Dock height 13 ft / 3.9 m Above MLW 13 ft / 3.9 m Above MLW 13 ft / 3.9 m Above MLW
Apron width 52 ft / 15.8 m 52 ft / 15.8 m 38 ft / 11.6 m

Open Storage

Sq. feet Sq. meters
15 acres / 6.1 Hectares
Warehouse A&B 17,400 1,616

Warehousing, Transit Shed and Bulk Storage Sq. Feet Sq. Meters

Sq. feet Sq. meters
L-Shed 12,500 1,161
T-Shed 1 57,000 5,296
T-Shed 2 26,000 2,416
T-Shed 3 57,000 5,296
T-Shed 4 30,000 2,787
Warehouse 3 70,000 6,503
Warehouse 4 (Bulk) 139,000 12,914
Warehouse 5 82,675 7,681
UREA Warehouse 24,000 2,230
Warehouse C & D 45,000 4,181
Warehouse E & F 17,500 1,626
Total 688,075 63,923