{"id":8731,"date":"2020-06-25T09:13:44","date_gmt":"2020-06-25T13:13:44","guid":{"rendered":"https:\/\/gaports.com\/?post_type=mto&#038;p=6520"},"modified":"2021-10-07T11:23:25","modified_gmt":"2021-10-07T15:23:25","slug":"billing-of-stand-by-time-on-cranes-2","status":"publish","type":"mto","link":"https:\/\/gaports.com\/es\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/","title":{"rendered":"Billing of Stand-By Time on Cranes and Missed Appointments (RULE 34-552)"},"content":{"rendered":"<p style=\"background: white;\">The bill-to party for the handling charges will be charged a missed crane appointment fee in an amount that equals one half of the minimum crane fee as specified in Rule 34-180 if the crane is not used at the scheduled crane appointment time. In addition to the missed crane appointment fee,\u00a0the bill-to party for the handling charges will also be billed for standby time, at the applicable standby rate, if it is requested that the Authority stand-by to perform a crane lift and the crane is not used at the scheduled crane appointment time.<\/p>\n<p>Standby charges will accrue from the scheduled crane appointment time until the crane is used. If a crane is ordered and not used during any eight (8) hour period, and not modified as outlined in Rule 34-560, a minimum of six (6) hours shall be assessed for straight time orders, and a minimum of seven (7) hours or eight (8) hours, as outlined in Rule 34-558, shall be assessed for overtime or legal holiday orders. Standby charges are assessed to each crane ordered and not used at the scheduled\/ordered time.<\/p>\n<p>Standby time charges are determined by using the labor rates specified in Rule 34-630 for the crane operator, the crane lead and the crane rigging crew at the applicable straight time, time and one-half, or double time rates on a per hour basis only, with no provisions made for a fractional part of the hour. Should standby time be incurred during the same hour in which the crane is used, the crane time will be billed at the applicable crane lease rates.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Note 1:<\/strong> \u00a0If a missed appointment fee is incurred,\u00a0the\u00a0bill-to party for the handling charges\u00a0will not be permitted to reschedule the appointment or schedule another crane appointment until the missed appointment fee has been\u00a0guaranteed or\u00a0paid.<\/p>\n","protected":false},"author":16,"featured_media":0,"menu_order":0,"template":"","meta":{"_acf_changed":false},"service_taxonomy":[121],"schedule_number_taxonomy":[63],"terminal_taxonomy":[38],"commodity_taxonomy":[108],"section_number_taxonomy":[77],"class_list":["post-8731","mto","type-mto","status-publish","hentry","service_taxonomy-equipment-leasing-rules","schedule_number_taxonomy-5-a","terminal_taxonomy-savannah-brunswick-garden-city-ocean-terminal-mayors-point","commodity_taxonomy-na-general-rule","section_number_taxonomy-equipment-and-labor-rules"],"acf":{"section_id":"","rule_number":"34-552","service_id":"","terminal_id":"","commodity_id":"","subject":"Billing of Stand-By Time on Cranes ","issue_date":"21-01-26","effective_date":"21-01-26"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Billing of Stand-By Time on Cranes and Missed Appointments (RULE 34-552) - Georgia Ports Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gaports.com\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Billing of Stand-By Time on Cranes and Missed Appointments (RULE 34-552) - Georgia Ports Authority\" \/>\n<meta property=\"og:description\" content=\"The bill-to party for the handling charges will be charged a missed crane appointment fee in an amount that equals one half of the minimum crane fee as specified in Rule 34-180 if the crane is not used at the scheduled crane appointment time. In addition to the missed crane appointment fee,\u00a0the bill-to party for [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gaports.com\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Georgia Ports Authority\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-07T15:23:25+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/gaports.com\\\/blog\\\/mto\\\/billing-of-stand-by-time-on-cranes-2\\\/\",\"url\":\"https:\\\/\\\/gaports.com\\\/blog\\\/mto\\\/billing-of-stand-by-time-on-cranes-2\\\/\",\"name\":\"Billing of Stand-By Time on Cranes and Missed Appointments (RULE 34-552) - Georgia Ports Authority\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/gaports.com\\\/#website\"},\"datePublished\":\"2020-06-25T13:13:44+00:00\",\"dateModified\":\"2021-10-07T15:23:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/gaports.com\\\/blog\\\/mto\\\/billing-of-stand-by-time-on-cranes-2\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/gaports.com\\\/blog\\\/mto\\\/billing-of-stand-by-time-on-cranes-2\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/gaports.com\\\/blog\\\/mto\\\/billing-of-stand-by-time-on-cranes-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/gaports.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Schedules\",\"item\":\"https:\\\/\\\/gaports.com\\\/blog\\\/mto\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Billing of Stand-By Time on Cranes and Missed Appointments (RULE 34-552)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/gaports.com\\\/#website\",\"url\":\"https:\\\/\\\/gaports.com\\\/\",\"name\":\"Georgia Ports Authority\",\"description\":\"Georgia Ports Authority official website with details on shipping ports in Georgia, port management, services, facilities, infrastructure, and operations statewide.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/gaports.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Billing of Stand-By Time on Cranes and Missed Appointments (RULE 34-552) - Georgia Ports Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gaports.com\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/","og_locale":"es_ES","og_type":"article","og_title":"Billing of Stand-By Time on Cranes and Missed Appointments (RULE 34-552) - Georgia Ports Authority","og_description":"The bill-to party for the handling charges will be charged a missed crane appointment fee in an amount that equals one half of the minimum crane fee as specified in Rule 34-180 if the crane is not used at the scheduled crane appointment time. In addition to the missed crane appointment fee,\u00a0the bill-to party for [&hellip;]","og_url":"https:\/\/gaports.com\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/","og_site_name":"Georgia Ports Authority","article_modified_time":"2021-10-07T15:23:25+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/gaports.com\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/","url":"https:\/\/gaports.com\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/","name":"Billing of Stand-By Time on Cranes and Missed Appointments (RULE 34-552) - Georgia Ports Authority","isPartOf":{"@id":"https:\/\/gaports.com\/#website"},"datePublished":"2020-06-25T13:13:44+00:00","dateModified":"2021-10-07T15:23:25+00:00","breadcrumb":{"@id":"https:\/\/gaports.com\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gaports.com\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/gaports.com\/blog\/mto\/billing-of-stand-by-time-on-cranes-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/gaports.com\/"},{"@type":"ListItem","position":2,"name":"Schedules","item":"https:\/\/gaports.com\/blog\/mto\/"},{"@type":"ListItem","position":3,"name":"Billing of Stand-By Time on Cranes and Missed Appointments (RULE 34-552)"}]},{"@type":"WebSite","@id":"https:\/\/gaports.com\/#website","url":"https:\/\/gaports.com\/","name":"Georgia Ports Authority","description":"Georgia Ports Authority official website with details on shipping ports in Georgia, port management, services, facilities, infrastructure, and operations statewide.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gaports.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"}]}},"_links":{"self":[{"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/mto\/8731","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/mto"}],"about":[{"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/types\/mto"}],"author":[{"embeddable":true,"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/users\/16"}],"wp:attachment":[{"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/media?parent=8731"}],"wp:term":[{"taxonomy":"service_taxonomy","embeddable":true,"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/service_taxonomy?post=8731"},{"taxonomy":"schedule_number_taxonomy","embeddable":true,"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/schedule_number_taxonomy?post=8731"},{"taxonomy":"terminal_taxonomy","embeddable":true,"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/terminal_taxonomy?post=8731"},{"taxonomy":"commodity_taxonomy","embeddable":true,"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/commodity_taxonomy?post=8731"},{"taxonomy":"section_number_taxonomy","embeddable":true,"href":"https:\/\/gaports.com\/es\/wp-json\/wp\/v2\/section_number_taxonomy?post=8731"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}