Georgia Ports Authority

Projects


Contract Pending
Results 1 - 3 of 3
Items per page:
« First  |  Page: 1  Last » 
1. GCT Reefer Rack Expansion (CB1 and CB6)
Project ID: 1709-0934   Bid Type: Construction   Status: Contract Pending
Posted: 9/28/2017   Project Bid Date: 6/26/2018

(MN)  The proposed project consists of providing all materials, equipment, and labor required to complete the fabrication and installation of 19 new refrigerated container racks, RTG runways and electrical infrastructure at the Garden City Terminal's Container Berths 1 and 6. 

Specifically, the project consists of all work required to provide and install concrete foundations and bearing pads, four story steel framed steel structures, a concrete pad for electrical equipment and all electrical work to support the installation of plugs for 24 refrigerated containers, … More »

2. CIT Colonel's Island Development FY18 (CIT Bulk Facility Demolition)
Project ID: 1710-0937A   Bid Type: Construction   Status: Contract Pending
Posted: 2/9/2018   Project Bid Date: 3/2/2018

(HGB) The proposed project will consist of providing all equipment and labor required for the demolition of the Colonels Island Bulk Facility and disposal of all demolition materials. This project shall include demolition of all above ground structures; equipment, including conveyors, transfer towers, ship loader and ship unloader; and privately-owned utilities with removal of all material from the site and minimal below surface removal. 

More »
3. Cold Storage Redevelopment Phase 1
Project ID: 1806-0952   Bid Type: Construction   Status: Contract Pending
Posted: 6/5/2018   Project Bid Date: 6/28/2018

(MN) The proposed project consists of providing all materials, equipment, and labor required to complete the demolition of the existing 93,000 +/- SF Cold Storage Building located along Tomochichi Road at the Garden City Terminal.  Specifically, the project consists of the demolition of the former 34,000 SF warehouse building with the wood piles being left in place but cut down. The existing 59,000 SF steel pile warehouse will be demolished down to the slab and the slab will be used for future parking.

Pre-Bid:  June 14, 2018

More »
« First  |  Page: 1  Last »